Group ID with CMS Screen Cross Reference | |||
Group ID : TASBC | |||
Description : TAS TL PLUS UPD TO BCJMF & BCPLT | |||
This page Display's Employee Group ID, and the Screen, that is used by Individual group's from Central office Lab, Engineers , Field Crew and District to make any changes to the CMS. | |||
"I" indicates Inquiry where an Employee can view the screen but cannnot make any changes. | |||
"U" indicates update, where an Employee can update the screen. | |||
"A" indicates to Add. |
|||
"D" Indicates delete. |
|||
EMPLOYEE | SCREEN | UPD/INQ | Screen Description |
TASBC | MONFN | I | MONITOR FINALIZATION |
TASBC | TBLS | I | REFERENCE TABLE MENU |
TASBC | TLCHG | U | SWITCH USER TEST LAB |
TASBC | BITAD | I | BITUMINOUS PRICE ADJUSTMENTS |
TASBC | CO | I | CHANGE ORDER |
TASBC | COH | I | CHANGE ORDER HISTORY |
TASBC | COREF | I | CHANGE ORDER REFERENCE |
TASBC | CORH | I | CO REFERENCE NUMBER HISTORY |
TASBC | DFLOW | I | DISTRICT CHANGE ORDER FLOW |
TASBC | EXPL | I | EXPLANATION OF NECESSITY |
TASBC | ITMAS | I | ITEM MASTER |
TASBC | UNCO | I | UN-APPROVED CHANGE ORDER |
TASBC | PCON | I | PROJECTS BY PROJECT CONTRACTOR |
TASBC | PCTY | I | PROJECTS FOR COUNTY/ROUTE/SECTION |
TASBC | PENG | I | PROJECTS BY PROJECT ENGINEER |
TASBC | PNUM | I | PROJECT BY PROJECT NUMBER |
TASBC | PRTE | I | PROJECTS BY ROUTE & SECTION |
TASBC | APSUB | I | REQUEST TO SUBLET |
TASBC | FEDWG | I | FEDERAL LABOR COMPLIANCE |
TASBC | LPREQ | I | LIST PRE-QUALIFIED CONTRACTORS |
TASBC | PAYRL | I | PAYROLL TRANSCRIPT REPORT |
TASBC | SUBS | I | SUBCONTRACTOR APPROVAL |
TASBC | SWORK | I | SUBCONTRACTOR WORK HISTORY |
TASBC | DDCEQ | I | CONTRACTOR EQUIPMENT |
TASBC | DDCON | I | CONTRACTOR WORK |
TASBC | DDHRS | I | STATE EMPLOYEES |
TASBC | DDRMK | I | APPROVAL & REMARKS |
TASBC | DDWAP | I | WEATHER & PAY |
TASBC | DRAFT | I | DRAFT ESTIMATES |
TASBC | EST | I | ESTIMATES |
TASBC | ESTH | I | ESTIMATE HISTORY |
TASBC | ESTR | I | ESTIMATE REFERENCE |
TASBC | ESTRH | I | ESTIMATE REFERENCE NUMBER HISTORY |
TASBC | LIENS | I | ESTIMATE DEDUCTIONS |
TASBC | LIQID | I | LIQUID DAMAGES & INCENTIVES |
TASBC | PEAPR | I | PE APPROVED ESTIMATES |
TASBC | FINAL | I | KEY EVENT TRACKING |
TASBC | FINQ | I | FINAL QUANTITIES |
TASBC | FINQH | I | FINAL QUANTITIES HISTORY |
TASBC | FTRAC | I | PROJECT FINAL TRACKING |
TASBC | DOCTR | I | DOCUMENT SUBMISSION TRACKING |
TASBC | FINAN | I | FINANCIAL DATA |
TASBC | KETRK | I | KEY EVENT TRACKING |
TASBC | LOCN | I | ADDITIONAL LOCATION DATA |
TASBC | PHONE | I | PROJECT PHONE NUMBERS AND CONTACTS |
TASBC | PROM | I | BASIC PROJECT DATA |
TASBC | SHED | I | CONTRACTOR PROGRESS SCHEDULE |
TASBC | DEMAT | I | DELIVERED MATERIALS |
TASBC | DREF | I | REFERENCE NUMBER PROFILE |
TASBC | LREF | I | LIST REFERENCE NUMBERS |
TASBC | PBOOK | I | PAYBOOK |
TASBC | TAKOF | I | QUANTITY TAKE-OFF SHEET |
TASBC | SSLST | I | STRUCTURAL STEEL REFERENCE LIST |
TASBC | SSREF | I | STRUCTURAL STEEL REFERENCE TRACKING |
TASBC | AB448 | I | 448 PAY FACTOR TABLE A & B |
TASBC | AGGQT | I | AGGREGATE QUANTITY TEST DATA |
TASBC | AGSPC | I | AGGREGATE SPECS |
TASBC | A446 | I | 446 PAY FACTOR TABLE A |
TASBC | BCJMF | U | BC JMF'S |
TASBC | BCPLT | U | BC PLANT INFORMATION |
TASBC | CD448 | I | 449 PAY FACTOR TABLE C & D |
TASBC | DASGN | I | DISPOSITION ON NON APPROVED MATERIAL |
TASBC | GBSPC | I | GLASS BEADS SPECS |
TASBC | IMA | I | INQUIRE ON MATERIALS ASSIGNMENTS |
TASBC | ISRC | I | INQUIRE ON SOURCES OF MATERIAL |
TASBC | LBCJ | I | LIST BC JMF'S |
TASBC | LBSTA | I | LAB BACKLOG STATUS |
TASBC | LMATL | I | LIST MATERIAL CODES |
TASBC | LPCJ | I | LIST PCC JMF'S |
TASBC | LPO | I | LIST PURCHASE ORDERS |
TASBC | LPRD | I | LIST PRODUCER/SUPPLIERS |
TASBC | LSMPL | I | LIST MATERIAL SAMPLES |
TASBC | LWELD | I | LIST WELDER/TECHNICIANS |
TASBC | MA | U | MATERIAL ASSIGNMENT |
TASBC | MATL | I | MATERIAL CODES |
TASBC | OUTEX | I | OUTLIER EXCLUSION |
TASBC | PBOM | I | PROJECT BILL OF MATERIAL |
TASBC | PCJMF | I | PCC JMF'S |
TASBC | PCPLT | I | PCC PLANT INFORMATION |
TASBC | PO | I | PURCHASE ORDERS |
TASBC | PRD | I | PRODUCER/SUPPLIERS |
TASBC | PRDMA | I | PRODUCER/SUPPLIERS MATERIAL |
TASBC | RAGG | U | AGGREGATE GRADATION TEST DATA |
TASBC | RASPG | U | AGGREGATE AVERAGE SPGR AND ABSORPTION REPORT |
TASBC | RBC | U | REPORT OF BC FIELD TESTS |
TASBC | RBMSG | U | BM AVERAGE SPECIFIC GRAVITY |
TASBC | RBSPG | U | AGGREGATE BULK SPECIFIC GRAVITY |
TASBC | RJMF | U | BC/PCC JMF'S |
TASBC | RMA | U | MATERIAL ASSIGNMENT DETAIL |
TASBC | RMATL | U | MATERIAL CODES/DESCRIPTION REPORT |
TASBC | RMCR | U | MATERIAL CONTROL REPORT |
TASBC | RMCSR | U | MATERIAL CONTROL SUMMARY REPORT |
TASBC | RNAPP | U | NON APPROVAL MATERIAL ASSIGNMENTS |
TASBC | ROUTL | U | OUTLIER STATISTICAL ANALYSIS |
TASBC | RPCC | U | PCC CYLINDERS |
TASBC | RPCCC | U | PCC CORES |
TASBC | RPCCS | U | PCC CYLINDER STANDARD DEVIATION |
TASBC | RPJMF | U | LIST OF PROJECTS FOR JMF |
TASBC | RPRDM | U | PRODUCER/SUPPLIER MATERIALS REPORT |
TASBC | RSTBO | U | STANDARD BILL OF MATERIALS |
TASBC | RSUMM | U | SUMMARY OF TEST SAMPLES (MATERIAL) |
TASBC | RSUMP | U | SUMMARY OF TEST SAMPLES (P/S) |
TASBC | RSUMS | U | SUMMARY OF TEST SAMPLES (LOC) |
TASBC | RTSTP | U | TESTS PERFORMED (PROJ/PO) |
TASBC | R446 | U | BC '446' PAY FACTORS |
TASBC | R448 | U | BC '448' PAY FACTORS |
TASBC | SCSPC | I | SODIUM AND CALCIUM CHLORIDE SPECIFICATIONS |
TASBC | SMPL | U | MATERIAL SAMPLE/TEST |
TASBC | SOJMF | I | SOIL/SUB-BASE CNS JMF'S |
TASBC | STBOM | I | STANDARD BILL OF MATERIALS |
TASBC | TE24 | U | TE-24 ASSIGNMENTS |
TASBC | WELD | I | WELDERS/TECHNICIANS |